You have two quotes for your new office. One costs less, but the other explains more of the work. Before you choose, look at the BOQ, or Bill of Quantities. It shows what each price covers and helps you spot gaps while there is still time to ask questions.
What Is a BOQ?
A BOQ is an itemised list of the work, materials, quantities, and costs needed for your office fit-out. It should show what each item is, how much is required, and how the cost is calculated. For example, “meeting room work” is hard to check. Separate entries for the partition, door, lights, power points, and paint give you a clearer picture. You can compare each item with your office plan and ask about anything that seems unclear. If you are still planning the layout, explore office interior design ideas to see the kinds of choices that can shape the scope.
Why Does the BOQ Matter?
An office fit-out can include partitions, ceilings, flooring, electrical work, air conditioning, furniture, and more. A single total does not show which of these items are included. A clear BOQ gives you a written scope to discuss with your designer or contractor. It also helps you compare quotes on the same basis. The BOQ supports budget planning, but the final cost still depends on the approved design, selected materials, site conditions, and any changes you request. Imagine Interiors design service includes design development and BOQ preparation as part of its process.
What Should an Office BOQ Include?

The quantities should match your floor plan and the work you have agreed on. Check that the BOQ covers the areas your team will use, such as workstations, meeting rooms, reception, and pantry.
Look for details such as:
- Work description: What will be supplied, built, installed, or removed?
- Material details: What type, size, finish, or brand is specified?
- Quantity and unit: Is the item measured in pieces, square feet, or another unit?
- Unit rate and total: Can you see how the cost for each item is worked out?
- Labour and related costs: Are installation and delivery included, where needed?
“Flooring” alone may not tell you enough. The BOQ should identify the chosen floor finish and the area it covers. Your selections affect the scope, so it helps to settle key details before work begins.
Where Can Hidden Costs Appear?

A quote can leave room for different expectations. Read the details beside your floor plan and ask what each unclear line means. For example, planning your office interior early can help you account for storage, lighting, circulation, and other needs in the BOQ.
Excluded Items
Some quotes cover the building work but leave out items your team still needs, such as desks, chairs, screens, network equipment, or signage. Ask for a written list of exclusions and find out who will supply each item.
Unclear Material Specifications
Words like “premium finish” do not identify a product. Ask for the material type, finish, size, and brand or an agreed alternative. If you have not chosen the final product, check what amount the quote allows for it.
Existing Site Conditions
The current electrical supply, air conditioning, ceiling, or plumbing may need changes once work begins. Ask what the contractor has inspected and what assumptions the price relies on. If a site issue changes the work, ask for the added cost before approving it.
What Is a Provisional Sum?
A provisional sum is an allowance for work or materials that are not fully specified when the quote is prepared. It is not always the final price. For example, the design for your pantry cabinets may still be in progress. Ask what materials and work the allowance covers, and how the cost will change once you approve the final design. Get the updated amount in writing before the work proceeds.
How Can You Compare Two Fit-Out Quotes?
Compare the scope and details, not just the final totals. Put both quotes beside the same floor plan and check:
- Do they cover the same rooms and work?
- Are the quantities similar?
- Do the material specifications match?
- Are furniture, equipment, and installation included?
- What has each contractor excluded?
- Which items are allowances that may change?
If one quote is lower, ask what explains the difference. It may reflect a different material, a smaller quantity, or work that is not included. When you are planning the project timeline too, learn how long office interior design can take and discuss how design decisions may affect the schedule.
What Should You Ask Before Signing?
Ask the contractor to explain any line you cannot connect to the design. Confirm who supplies furniture and equipment, which items may change in price, and how the team will handle changes to the scope. Also check the payment schedule and project timeline. If you request a change during the fit-out, ask for its cost and time impact in writing before approving it.
Can a BOQ Prevent Every Extra Cost?
No. You may change your design or choose a different finish. The team may also find a site condition that was not visible earlier. A BOQ cannot predict every change, but it gives you a clear starting point for reviewing new costs. Before you approve the quote, make sure the BOQ matches the design you agreed on. If an item is vague or missing, ask for clarification while you still have time to make an informed choice. Planning an office interior in Bangladesh? Contact with Imagine Interiors design services to learn about its design and BOQ process.









